Sasaki Steel Structure

Posted: 03.25.11


We've finished the steel structure. Our pre fabricated steel done by C2C has been delivered, placed, welded and finished. We are now able to remove the temporary structure that has been supporting the house for the past few months. Next we'll be finishing the slab and installing our window systems. We'll also be installing a lanai and roof which we've shop fabricated.


Back to blog

Other Recent Posts

C2C-1 is nearing design completion

This home features 3 bedrooms and a master suite complete with study and master bathroom.

C2C Home Office Completed

C2C completes it's home office which serves as it's prototype for our coming C2C Homes concept.

C2C-2 has completed design

This home features 3 bedrooms and a master suite complete with study and master bathroom.

C2C office pod

This is our prototype office pod being completed in our new shop.

Our first project

Our first project being completed in our new building method.

Sasaki Steel Structure

Completion of steel structure

North Shore Project

Landscaping and stone mosaic

Custom Door Handle

Custom door handle

Sasaki lanai details

Details of the Sasaki lanai

North Shore Project

Joglo Roof pre fabrication

Trade show booth

c2c Home show booth

Virtual Tour

Fly through animation

Kailua Residence

The start

Plan of the month-January

January Plan of the month

Plan of the Month- March

March Plan of the Month

Plan of the Month-April

April Plan of the month

Kailua Residence

Steel installation

Kailua Residence

Kailua Residence Addition

Manoa Residence

Manoa Residence

Plan of the Month-August

August Plan of the Month