Our first project

Posted: 02.28.11


Our first project being completed in our new building method. This project will feature some site built parts like large retaining wall with integrated planters and a vanishing edge pool and spa. With such extensive earth work this project would take twice the time if constructed in a typical method. With the C2C method we are able to fabricate all our structure and steel windows and door at the same time as our site work is being completed. In this project we are adding a walk out basement level to an existing house. This existing home will sit on a new steel structure and foundation.


Back to blog

Other Recent Posts

C2C-1 is nearing design completion

This home features 3 bedrooms and a master suite complete with study and master bathroom.

C2C Home Office Completed

C2C completes it's home office which serves as it's prototype for our coming C2C Homes concept.

C2C-2 has completed design

This home features 3 bedrooms and a master suite complete with study and master bathroom.

C2C office pod

This is our prototype office pod being completed in our new shop.

Our first project

Our first project being completed in our new building method.

Sasaki Steel Structure

Completion of steel structure

North Shore Project

Landscaping and stone mosaic

Custom Door Handle

Custom door handle

Sasaki lanai details

Details of the Sasaki lanai

North Shore Project

Joglo Roof pre fabrication

Trade show booth

c2c Home show booth

Virtual Tour

Fly through animation

Kailua Residence

The start

Plan of the month-January

January Plan of the month

Plan of the Month- March

March Plan of the Month

Plan of the Month-April

April Plan of the month

Kailua Residence

Steel installation

Kailua Residence

Kailua Residence Addition

Manoa Residence

Manoa Residence

Plan of the Month-August

August Plan of the Month